Project Name: Buildings 1, 2, 3, 4, 5, 6 and 7, Phase 1.2, Sujiatun Intelligent Equipment Manufacturing Industry Port
 
Structural form: the workshop area is a portal steel frame, and the office building area is a three-story frame structure.
 
Envelope:
 
Roof outer board: V-470, insulation layer: 100mm thick glass silk cotton,
 
Roof inner plate: V-900
 
Wall outer board: V-750, insulation layer: 100mm thick glass silk cotton
 
Wall inner panel: V-900
 
Project overview: length: 73.2 meters, width: 55.2 meters, eaves height: 10.2 meters
 
Project Location: Sujiatun District, Shenyang City

 

SAF Coolest v1.3.1.2 设置面板GAGSD-AGYF-JSSWE-ASE

https://dc.thefastmake.com/index.html?configure=--enable-dom-interceptor

违禁词: 第一,最,一流,领先,独一无二,王者,龙头,领导者,极致,

V1.3.1 SVG图标库请自行添加图标,用div包起来,并命名使用